Figures are a guide for ordering materials. Ask a concreter to check the plan, the steel, and the pour before you buy.
Concrete calculator
This concrete calculator works out how much concrete you need in cubic metres for a job in Australia (AU).
You can enter a slab, post holes, a footing, or stairs. The page is an online quantity tool: it prints 20 kg bag counts and weight. It does not price the concrete.
If you only know area and thickness, use the square metre path. If you know length and width, use the metre path. Both give a concrete volume in m3.
What are you pouring?
Pick the shape that matches your job.
How will you enter the slab size?
How thick is the pour?
Defaults follow a common path and driveway guide. You can type another thickness.
Slab measurements
A 12 by 12 foot slab is about 3.7 metres each way. Enter metres here.
Post hole measurements
Concrete fills the round hole around a square post.
Footing or round pier?
Footing measurements
Stair measurements
Going is the tread depth. Riser is the step height.
Your result
Slab, path, or driveway · Length and width · 75 mm thick
Add your measurements
Concrete calculator
Enter length in metres, width in metres.
Fill in the boxes and we will print cubic metres, bags, and weight.
More about this answer
Before you ring the plant or load the trailer, you need one number: how much concrete the pour fills. That number is almost always in cubic metres.
Enter the shape on the form. Slabs, paths, and driveways use length times width times thickness. You can also enter area in m2 when you already know the footprint.
The concrete calculator formula is length times width times thickness in metres, or area in m2 times thickness in metres.
A cubic metre is roughly a cube one metre wide, one metre long, and one metre high. Plants and truck tickets speak in m3, not in bags. Bags are a hardware store unit for small jobs.
Measure on site with a tape and write down metres. A concrete measurement calculator only works when the sizes are real. Thickness often comes from a path or driveway note on the plan.
BGC and Boral publish their own volume helpers on bag sheets and websites. A concrete calculator au page still needs your measurements, not a default slab size. An australian concrete calculator reads metres and cubic metres, not feet.
Cement Australia and Swan quote about 110 bags of 20 kg premix per cubic metre on common bag labels. Your bag may print a different yield. Use the label when you buy bags.
If you are still asking how much concrete do I need, fill in the form once and read the order volume line. Spillage and an uneven base are why the order volume is a little higher than the measured volume.
Some older plans print cubic meters. Enter the same thickness in metres and you get the same volume. A concrete qty calculator line is only as good as the quantities you measured on the ground.
- Work out how to figure concrete calculator inputs by measuring the pour, not by guessing from the plan scale.
- A concrete material quantity calculator still needs length, width, depth, or area from the site.
- Orders under half a cubic metre usually stay on premix bags. Larger pours usually move to a truck.
- Check access before you order a truck. A long chute or a pump is a separate quote from the concrete itself.
Your result
Slab, path, or driveway · Length and width · 75 mm thick
Add your measurements
Concrete bag calculator
Enter length in metres, width in metres.
Fill in the boxes and we will print cubic metres, bags, and weight.
More about this answer
Small pours often finish on 20 kg premix bags from the hardware store. Each bag already holds cement, sand, and stone. You add water on site and place the mix in the hole or form.
The bag count on your result uses the order volume, not the measured volume on its own. It assumes about 110 bags of 20 kg per cubic metre on that order figure. Boral bag sheets often quote 108. Read the yield on the bag you pick up.
Premix bags are not the same as buying loose cement, sand, and stone. When you batch from separate ingredients, suppliers publish ratio tables. Cockburn Cement is one example.
For higher strength mixes, Cockburn lists 1 part cement to 1.5 parts sand to 3 parts stone.
That row uses about 18 bags of cement per cubic metre.
For paths, driveways, and floor slabs, the same table uses 1 cement to 2 sand to 4 stone.
That row is about 14 bags of cement per cubic metre.
Domestic footings in that table use 1 cement to 2.5 sand to 5 stone, with about 12 bags of cement per cubic metre.
Do not swap those ratio counts for the 110 premix bag line on your result. They answer different shopping trips.
Ready mixed concrete is the truck delivery. You still need the cubic metres from this page first. Then the plant batches N20 or another grade to that volume.
Named strength such as N20 comes from the plant batch. A bag does not guarantee that grade on the ticket.
Bagged premix suits fence holes and small pads. Mixing on site with separate sand and cement is a different shopping list. A 20kg bag line on the shelf is the common hardware unit.
- A mixing concrete ratio table counts cement bags, not 20 kg premix sacks. Do not swap the two.
- Concrete mix proportions on a bag sheet describe the mixture inside that one sack.
- Store bags flat and dry. A torn bag leaks fine cement and weighs less than the label says.
- One person can mix a post hole by hand. A slab pour needs mates, a barrow, and a clear path.
- Return unopened bags when the job finishes under budget. Opened bags seldom keep for the next job.
Your result
Slab, path, or driveway · Length and width · 75 mm thick
Add your measurements
Concrete slab calculator
Enter length in metres, width in metres.
Fill in the boxes and we will print cubic metres, bags, and weight.
More about this answer
A slab pour is a flat pad with a set thickness. Shed slabs, paths, driveways, and small house floors all use the same sum: area times depth.
Pick slab on the form. Enter length and width in metres, or enter area when you already measured the footprint. Choose a thickness preset for a path or driveway, or type the millimetres from your plan.
Imperial sizes still convert to metres on site. A 3x3 foot pad is about 0.9 m each way, not three metres. A 12x12 foot pad is about 3.7 m each way. Measure before you order.
Thickness changes strength and cost more than width does. A path for foot traffic is thinner than a driveway for cars. A heavy vehicle bay goes deeper again.
This page finds volume only. Engineering, reinforcement, and finish are separate decisions. A design drawing might call for mesh or bar steel that does not change the cubic metres.
When you price the whole job, labour, pump hire, and finish colour sit on top of the concrete volume. A concrete slab material list on site includes formwork timber, mesh, and the pour itself.
Garage flooring and plain grey flatwork use the same volume maths. Measure the slab footprint and thickness before you talk about a flooring finish.
- Formwork must be tight before you pour. Gaps leak paste and change the finished level.
- Screed and finish time starts when the truck arrives. Have enough hands for the area you calculated.
- Cure the slab with water or a curing blanket in hot weather so it does not dry too fast.
Your result
Slab, path, or driveway · Length and width · 75 mm thick
Add your measurements
Concrete price calculator
Enter length in metres, width in metres.
Fill in the boxes and we will print cubic metres, bags, and weight.
More about this answer
This page does not print a price. Concrete cost moves with strength, distance, time of day, and how full the truck is. There is no one national rate to quote.
Start with the cubic metres from your pour. Plants price on order volume. A concreter quote often bundles place, finish, and labour around that same volume.
A small load can cost more per cubic metre because the truck is not full. That is normal on post holes and small paths. Bags can be cheaper for tiny work even when the per-bag price looks high.
Slab quotes separate concrete supply from formwork, steel, pump hire, and finish. A polished or exposed finish sits on a different page to a plain grey pour.
Driveway prices with colour or exposed stone use a driveway cost page on this site. That page covers square metres and finish, not just the grey volume here.
A full fence quote covers posts, rails, gates, and labour. Here you only priced the concrete in the holes.
Use the quote button when you want a local concreter to look at access, finish, and timing. Bring the cubic metres and bag count from your result.
Plant pricing and concreter pricing use different line items. A cost estimate from the yard is not the same as a cost estimator on a builder website. A concrete pad cost quote and a whole floor cost quote both start with the same m3 number.
- Ask whether the plant quote includes delivery and a waiting time on site.
- Concrete pricing changes with strength, time of day, and how full the truck is.
- Weekend pours and after-hours loads often carry a plant surcharge. That is not in this volume tool.
- Council crossovers and pump hire are separate line items on many driveway quotes.
Your result
Slab, path, or driveway · Length and width · 75 mm thick
Add your measurements
Concrete post hole calculator
Enter length in metres, width in metres.
Fill in the boxes and we will print cubic metres, bags, and weight.
More about this answer
A fence post sits in a round hole, but the post is square. Use this concrete calculator for post holes when you know the hole size, the post width, and how many posts you are setting.
Enter the hole diameter and depth in millimetres. Enter the post width across the flat faces. Enter the number of holes. The page finds the concrete in the gap around each post.
Do not round each hole to whole bags and then add them. Put every hole into one total, then allow for spillage once at the end.
Charts from bag makers are a quick check. A 90 mm post in a 300 mm hole 600 mm deep is often about 3 to 4 bags per hole before spillage. A 75 mm post in a 250 mm hole is often about 2 to 3 bags per hole on the same charts.
One post is the same maths as a row of posts. If you ask how much concrete do I need for a fence post, measure that hole and set the count to one. The question how much concrete do I need for a post hole uses the same boxes.
A timber or steel pier that is formed in a round cage belongs on the footing path, not the fence hole path. Deck piers and structural piers need the pier shape when the hole is really a column.
Bag labels and site rules still win over any chart. Buy a little extra on a hot day when the mix dries fast.
- Dig the hole wider than the post so concrete can surround the timber and hold it upright.
- Wet the hole lightly before you pour so the dry soil does not steal water from the mix.
- Brace the post plumb while the concrete goes off. The volume here does not include bracing timber.
Your result
Slab, path, or driveway · Length and width · 75 mm thick
Add your measurements
Concrete footing calculator
Enter length in metres, width in metres.
Fill in the boxes and we will print cubic metres, bags, and weight.
More about this answer
A footing is the concrete beam or pad under a wall, post, or frame. Pick footing on the form when the sizes come from a plan, not from a dug fence hole.
A strip footing uses length, width, and depth in metres. A round pier uses diameter, depth, and how many piers you are pouring.
Steel and mesh do not change the cubic metres here. They hold cracks closed, but they are not part of the volume sum.
Plans often call the same part a footer. Spelling changes, but the pour is still a footing under the load.
The words foundation and footing usually mean the concrete that carries the building. A concrete base under a wall is not the same thing as crushed rock road base.
When the engineer gives a pier schedule, use the pier shape even if the search name sounds like a fence hole. Structural piers need diameter and depth from the detail, not a rule of thumb.
- Width and depth should match the drawing. Do not guess a footing width from a retaining wall height alone.
- Round down only after you have one total volume for the whole footing run.
- Retaining wall concrete is priced on a different page when you are budgeting the wall, not just the footing.
Your result
Slab, path, or driveway · Length and width · 75 mm thick
Add your measurements
Concrete stair calculator
Enter length in metres, width in metres.
Fill in the boxes and we will print cubic metres, bags, and weight.
More about this answer
Concrete stairs are two volumes added together. The sloping waist forms the ramp under the treads. The treads add triangles at each step.
Measure the number of risers, the going on each tread, the riser height, the stair width, and the waist thickness. Going is the tread depth. Riser is the step height.
Rise and run on a site measure mean the same two numbers. This page does not check whether the steps meet building rules. It only finds the concrete volume from your sizes.
Steep stairs pour more waist concrete. Wide treads pour more tread concrete. Enter millimetres for going, riser, width, and waist so you do not mix units.
- Measure on the formwork or the plan before you pour, not from an old photo.
- A closed stringer can hide part of the waist. Use the thickness shown on the detail you are forming.
- Vibrating concrete in tight tread corners reduces voids. That step does not change the volume you order.
Your result
Slab, path, or driveway · Length and width · 75 mm thick
Add your measurements
Concrete weight calculator
Enter length in metres, width in metres.
Fill in the boxes and we will print cubic metres, bags, and weight.
More about this answer
Weight helps when you are lifting, barrowing, or checking whether a truck can reach a tight site.
Holcim quotes about 2,400 kg per cubic metre as the AS 3600 default for normal concrete. Light mixes can sit lower. Heavy mixes can sit higher.
The weight figure on your result uses the measured volume, not the bag count on its own. Bags are sales units. Cubic metres are what the pour weighs once placed.
- Divide kilograms by 1,000 when a supplier speaks in tonnes on the delivery docket.
- Two or three decimals on cubic metres is enough for ordering. Weight rounds to the nearest kilogram.
- Access limits on a path or steps are a site question. Weight is only one part of that check.
Cubic metres are what you tell the plant. Bags are premix from the hardware store. This page does not print a concrete price.